Quality Assurance
All KINGDOM products are manufactured under the ISO 9001 Quality Management System, with strict quality monitoring and inspection at every key stage of production.
In-Process Quality Monitoring
From product design to final production, every key process — including tube bending, cutting, welding, pre-treatment, and powder coating — is managed under strict quality protocols.
Each critical stage features first-article inspection, random sampling inspection, and final assembly verification, guaranteeing that every component and finished unit meets the highest standards of precision and performance.
Comprehensive written and visual records are maintained throughout the entire production process. In the event of any anomaly, these records enable rapid traceability and root-cause analysis, ensuring that issues are resolved at their source and product quality remains uncompromised.
Final Product Testing
KINGDOM operates an independent product testing laboratory, implementing full-process quality monitoring based on EN 957, ASTM, and other relevant international standards.
The laboratory is equipped to conduct a wide range of fitness equipment tests, including stability tests, static load tests, dynamic load tests, durability/lifespan tests, and electrical performance tests. In addition to whole-unit testing, the lab can perform precise dimensional measurements of components, tensile and compression tests, hardness testing, coating thickness measurement, and coating adhesion testing.
To meet the most stringent fatigue and durability requirements, KINGDOM has independently developed and manufactured proprietary fatigue testing equipment. All cardio and strength products undergo over 100,000 cycles of fatigue and durability testing, far exceeding the requirements of EN 957 international standards.
-
Static loading testLoad 6 times the net weight of the product
-
Cycle test250,000 cycles at the maximum specified load over 80% of the possible range of movement
-
Cable strain testMin 9000N(900kgs)
-
Bearing durability test
-
Cable endurance testMin 250,000 times
-
Package drop test
-
Carton density testOnly qualified carton can be used for product packaging
-
Stability testThe platform inclines 10°to inspect whether the machine is stable
-
Anti-rust salty spray testTesting duration:24-48 hours subject to the product
-
Sound room testEvery Cardio machines need to go through the sound room to do the final inspection, where the decibels value is lower than 76dbs